Construction Materials Price list in Oros
Price of Cement & Sand in Oros
Last Updated: June 2026
| Cement & Sand | Unit | Minimum Rate | Average Cost | Max. Price |
| Cement | Bag |
₹ 340 |
₹ 365 |
₹ 395 |
| River Sand | Unit (100 CFT) |
₹ 7800 |
₹ 8400 |
₹ 9050 |
| M Sand | Unit (100 CFT) |
₹ 5500 |
₹ 5900 |
₹ 6400 |
Construction Bricks Rate in Oros
| Bricks | Unit | Minimum Rate | Average Cost | Max. Price |
| Clay Bricks |
Piece |
₹ 11 |
₹ 12 |
₹ 13 |
| Cement Blocks |
Piece |
₹ 35 |
₹ 39 |
₹ 42 |
| AAC Blocks |
Cubic Meter |
₹ 44 |
₹ 48 |
₹ 53 |
| Gravel |
CFT |
₹ 42 |
₹ 46 |
₹ 50 |
TMT Steel Price in Oros
| TMT Steel | Unit | Minimum Rate | Average Cost | Max. Price |
| TMT Steel |
Ton |
₹ 57050 |
₹ 61650 |
₹ 65600 |
Electrical Materials Price list - Oros
| Electrical Items | Unit | Minimum Rate | Average Cost | Max. Price |
| Conduit Pipes |
Rft |
₹ 39 |
₹ 43 |
₹ 55 |
| Metal Boxes 6 Switches |
Piece |
₹ 73 |
₹ 80 |
₹ 100 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM |
Coil |
₹ 1350 |
₹ 1500 |
₹ 1900 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH |
Coil |
₹ 5550 |
₹ 6100 |
₹ 7750 |
| Switches Lower Range |
Piece |
₹ 28 |
₹ 31 |
₹ 39 |
| Switches High Range |
Piece |
₹ 175 |
₹ 195 |
₹ 250 |
| Sockets |
Piece |
₹ 12 |
₹ 13 |
₹ 17 |
| Dimmers |
Piece |
₹ 290 |
₹ 315 |
₹ 405 |
| MCB |
Piece |
₹ 280 |
₹ 305 |
₹ 390 |
Plumbing Materials Rate list : Oros
| Plumbing Items | Unit | Minimum Rate | Average Cost | Max. Price |
| Pipes CPVC |
Length |
₹ 390 |
₹ 430 |
₹ 485 |
| Pipes UPVC |
Length |
₹ 300 |
₹ 330 |
₹ 375 |
| Pipes PVC |
Length |
₹ 220 |
₹ 245 |
₹ 280 |
| UPVC |
Length |
₹ 625 |
₹ 690 |
₹ 785 |
Timber Wood Prices in Oros
| Timber / Wood Cost | Unit | Minimum Rate | Average Cost | Max. Price |
| Timber |
Cubic Foot |
₹ 840 |
₹ 920 |
₹ 1050 |
| Teak Wood |
Cubic Foot |
₹ 1800 |
₹ 2000 |
₹ 2250 |
Floor Tiles / Granite Prices in Oros
| Floor | Unit | Minimum Rate | Average Cost | Max. Price |
| Granite |
Sq.Ft |
₹ 190 |
₹ 210 |
₹ 240 |
| Marbles |
Sq.Ft |
₹ 370 |
₹ 405 |
₹ 460 |
| Tiles |
Sq.Ft |
₹ 63 |
₹ 69 |
₹ 79 |
Painting Rates ( Home & Office buildings) in Oros
| Painting Rate | Unit | Minimum Rate | Average Cost | Max. Price |
| Paint Per Litre |
Litre |
₹ 335 |
₹ 360 |
₹ 400 |
| Per Square Feet |
Sq.Ft |
₹ 35 |
₹ 38 |
₹ 42 |
Metal Railing & Gril work cost in Oros for Construction
| Railing and Grills | Unit | Minimum Rate | Average Cost | Max. Price |
| Raliling And Grills - Running Feet |
Rft |
₹ 1750 |
₹ 1900 |
₹ 2050 |
| Raliling And Grills - Per Kg |
Kg |
₹ 130 |
₹ 140 |
₹ 150 |
Building Materials price also applicable to following areas of Oros
This Price list covers Other locations like Sawantwadi, Kudal, Kankavli, Malvan, Vengurla, Devgad, Vaibhavwadi, Dodamarg, Amboli, Tarkarli, Vijaydurg, Kunkeshwar, Achara, Pinguli, Humarmala, Banda, Zarap, Nerur, Oras, Shiroda.
Find the latest building construction material prices in in Oros, .
The prices below are indicative and may vary depending on wholesale, retail, online stores, transport, GST, and dealer locations.
Find Construction materials / Building materials Price list
FAQ's about Building Material Rates in Oros
Q: Cost of electrical wiring per coil in Oros?
Answer: For your Oros home, wiring coils start at ₹340. Copper rates affect this price, with premium brands reaching ₹425.
Q: How to calculate TMT Steel requirement for Oros projects?
Answer: Multiply your built-up area by standard thumb rules. In Oros, your TMT Steel cost will range from ₹57050 to ₹71350 per Ton.
Q: What is the labor cost for River Sand work in Oros?
Answer: Labor in Oros for handling River Sand is roughly 20% of the material cost. If River Sand is ₹7800, labor will be additional per Unit (100 CFT).
Q: Is insurance available for Clay Bricks transport in Oros?
Answer: For large site deliveries in Oros, insurance is recommended. The base Clay Bricks cost is ₹11, and insurance is a small add-on.
Q: How much Paint is needed for a 1000 sq ft house in Oros?
Answer: For 1000 sq ft in Oros, you will need significant volume. At ₹335 per Litre, your total Paint budget will be a major part of the civil cost.