Construction Materials Price list in Ooty
Price of Cement & Sand in Ooty
Last Updated: June 2026
| Cement & Sand | Unit | Minimum Rate | Average Cost | Max. Price |
| Cement | Bag |
₹ 320 |
₹ 345 |
₹ 370 |
| River Sand | Unit (100 CFT) |
₹ 7500 |
₹ 8050 |
₹ 8700 |
| M Sand | Unit (100 CFT) |
₹ 5300 |
₹ 5700 |
₹ 6150 |
Construction Bricks Rate in Ooty
| Bricks | Unit | Minimum Rate | Average Cost | Max. Price |
| Clay Bricks |
Piece |
₹ 11 |
₹ 12 |
₹ 13 |
| Cement Blocks |
Piece |
₹ 34 |
₹ 37 |
₹ 41 |
| AAC Blocks |
Cubic Meter |
₹ 43 |
₹ 47 |
₹ 52 |
| Gravel |
CFT |
₹ 41 |
₹ 45 |
₹ 49 |
TMT Steel Price in Ooty
| TMT Steel | Unit | Minimum Rate | Average Cost | Max. Price |
| TMT Steel |
Ton |
₹ 54800 |
₹ 59200 |
₹ 63050 |
Electrical Materials Price list - Ooty
| Electrical Items | Unit | Minimum Rate | Average Cost | Max. Price |
| Conduit Pipes |
Rft |
₹ 38 |
₹ 42 |
₹ 53 |
| Metal Boxes 6 Switches |
Piece |
₹ 70 |
₹ 77 |
₹ 98 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM |
Coil |
₹ 1300 |
₹ 1450 |
₹ 1850 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH |
Coil |
₹ 5300 |
₹ 5850 |
₹ 7450 |
| Switches Lower Range |
Piece |
₹ 27 |
₹ 30 |
₹ 38 |
| Switches High Range |
Piece |
₹ 170 |
₹ 185 |
₹ 240 |
| Sockets |
Piece |
₹ 12 |
₹ 13 |
₹ 17 |
| Dimmers |
Piece |
₹ 275 |
₹ 305 |
₹ 385 |
| MCB |
Piece |
₹ 265 |
₹ 295 |
₹ 375 |
Plumbing Materials Rate list : Ooty
| Plumbing Items | Unit | Minimum Rate | Average Cost | Max. Price |
| Pipes CPVC |
Length |
₹ 375 |
₹ 410 |
₹ 465 |
| Pipes UPVC |
Length |
₹ 285 |
₹ 315 |
₹ 360 |
| Pipes PVC |
Length |
₹ 215 |
₹ 235 |
₹ 265 |
| UPVC |
Length |
₹ 600 |
₹ 660 |
₹ 750 |
Timber Wood Prices in Ooty
| Timber / Wood Cost | Unit | Minimum Rate | Average Cost | Max. Price |
| Timber |
Cubic Foot |
₹ 805 |
₹ 885 |
₹ 1000 |
| Teak Wood |
Cubic Foot |
₹ 1750 |
₹ 1900 |
₹ 2200 |
Floor Tiles / Granite Prices in Ooty
| Floor | Unit | Minimum Rate | Average Cost | Max. Price |
| Granite |
Sq.Ft |
₹ 185 |
₹ 200 |
₹ 230 |
| Marbles |
Sq.Ft |
₹ 355 |
₹ 390 |
₹ 445 |
| Tiles |
Sq.Ft |
₹ 60 |
₹ 66 |
₹ 75 |
Painting Rates ( Home & Office buildings) in Ooty
| Painting Rate | Unit | Minimum Rate | Average Cost | Max. Price |
| Paint Per Litre |
Litre |
₹ 320 |
₹ 345 |
₹ 385 |
| Per Square Feet |
Sq.Ft |
₹ 34 |
₹ 37 |
₹ 41 |
Metal Railing & Gril work cost in Ooty for Construction
| Railing and Grills | Unit | Minimum Rate | Average Cost | Max. Price |
| Raliling And Grills - Running Feet |
Rft |
₹ 1700 |
₹ 1850 |
₹ 1950 |
| Raliling And Grills - Per Kg |
Kg |
₹ 125 |
₹ 135 |
₹ 145 |
Building Materials price also applicable to following areas of Ooty
This Price list covers Other locations like Ooty, Coonoor, Kotagiri, Gudalur, Wellington, Kundah, Masinagudi, Aravankadu, Lovedale, Ketty, Naduvattam, Pykara, Manjoor, Devarshola, Cherambadi, Pandalur, Nelliyalam, Kil Kotagiri, Yedappalli, Fingerpost.
Find the latest building construction material prices in in Ooty, .
The prices below are indicative and may vary depending on wholesale, retail, online stores, transport, GST, and dealer locations.
Find Construction materials / Building materials Price list
FAQ's about Building Material Rates in Ooty
Q: Does the Cement price in Ooty include GST?
Answer: Usually, the quoted rate of ₹320 in Ooty is the base price. After 18-28% GST, the final cost of Cement comes to approximately ₹360.
Q: How to check the quality of TMT Steel in Ooty?
Answer: For TMT Steel in Ooty, always check the ISI mark. Standard quality starts at ₹54800, while high-strength variants are priced at ₹68500.
Q: Which River Sand grade is used for slab casting in Ooty?
Answer: For slabs in Ooty, engineers recommend premium River Sand usually priced at ₹9400. Standard grades at ₹7500 are used for non-load bearing parts.
Q: What is the rate of wooden door frames in Ooty?
Answer: Sal wood frames in Ooty start at ₹11 per cubic foot. Teak wood is much higher at ₹13.
Q: How much does Paint cost per Litre in Tamil Nadu today?
Answer: For the Tamil Nadu region, Paint is currently trading between ₹320 and ₹400. Local transport in Ooty may affect the final landing cost.