| Area of Construction | 840 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1743000 Rs. |
| Construction Cost in Lacs | ₹ 17.4 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 840 Sq. ft. | 840 Sq. ft. | 840 Sq. ft. |
| Construction Estimate | ₹ 1495200 Rs. | ₹ 1638000 Rs. | ₹ 1890000 Rs. |
| Construction Cost in Lacs | ₹ 14.952 Lacs | ₹ 16.38 Lacs | ₹ 18.9 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 840 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1394400 Rs. |
| Construction Cost in Lacs | ₹ 13.944 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 840 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1344000 Rs. |
| Construction Cost in Lacs | ₹ 13.44 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 840 Square feet of area
*The 840 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 840 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 330 | 353 | ₹ 116,490 |
| River Sand | Unit (100 CFT) | ₹ 7600 | 15.12 | ₹ 114,912 |
| M Sand | Unit (100 CFT) | ₹ 5300 | 15.12 | ₹ 80,136 |
| Clay Bricks | Piece | ₹ 11 | 7980 | ₹ 86,184 |
| Cement Blocks | Piece | ₹ 34 | 1008 | ₹ 34,272 |
| AAC Blocks | Cubic Meter | ₹ 43 | 29.4 | ₹ 1,264 |
| Gravel | Cubic Foot | ₹ 41 | 260.4 | ₹ 10,676 |
| TMT Steel | Ton | ₹ 55350 | 2.94 | ₹ 162,788 |
| Conduit Pipes | Rft | ₹ 38 | 1260 | ₹ 47,880 |
| Metal Boxes 6 Switches | Piece | ₹ 71 | 16.8 | ₹ 1,193 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 12.6 | ₹ 16,670 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5350 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 126 | ₹ 3,402 |
| Switches High Range | Piece | ₹ 170 | - | - |
| Sockets | Piece | ₹ 12 | 84 | ₹ 1,008 |
| Dimmers | Piece | ₹ 280 | - | - |
| MCB | Piece | ₹ 270 | 8.4 | ₹ 2,268 |
| Pipes CPVC | Length | ₹ 375 | 126 | ₹ 47,502 |
| Pipes UPVC | Length | ₹ 290 | 100.8 | ₹ 29,131 |
| Pipes PVC | Length | ₹ 215 | 84 | ₹ 18,144 |
| UPVC | Length | ₹ 610 | - | - |
| Timber | Cubic Foot | ₹ 815 | 21 | ₹ 17,073 |
| Teak Wood | Cubic Foot | ₹ 1750 | - | - |
| Granite | Sq.Ft | ₹ 185 | 126 | ₹ 23,436 |
| Marbles | Sq.Ft | ₹ 360 | - | - |
| Tiles | Sq.Ft | ₹ 61 | 1092 | ₹ 66,612 |
| Paint Per Litre | Litre | ₹ 325 | 151.2 | ₹ 48,838 |
| Per Square Feet | Sq.Ft | ₹ 34 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1700 | - | - |
This cost estimate covers key locations such as Ukhrul Town, Chingai, Lungchong Maiphai, Jessami, Katra, Hundung, Shirui, Somdal, Talui, Khamasom, Chingjaroi, Peh, Huining, Paorei, Phungreitang, Viewland, Hamleikhong, Wino Bazar, Dungrei, Sangshak.
Building in the high-altitude district of Ukhrul involves managing construction in a cold, rugged terrain with high seismic risk. For a 840 sqft Residential build reaching ₹1,743,000, the rate of ₹2075 per sqft reflects the logistical costs of transport and the requirement for high-thermal-efficiency designs. The Standard material selection focuses on structural resilience and cold protection. Interior luxury often features local Basic woodwork and Vitrified Tiles flooring. The soil is predominantly rocky and stable, providing an excellent base for foundations, though builders must prioritize robust retaining structures and sloped roofing.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: In Ukhrul, Building construction is optimized for its specific use, resulting in the current ₹2,075 rate.
A: In Manipur, particularly in Ukhrul, the rate is ₹2,075 per sq ft for 2026.
A: For 2026, a 840 sq ft Building project in Ukhrul is estimated at ₹1,743,000 using Standard quality materials.
A: Steel prices in Ukhrul are factored into the ₹2,075 rate for your 840 sq ft project.
A: The ₹1,743,000 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: Given the current ₹2,075 rate in Ukhrul, starting in 2026 helps avoid future material price hikes in Manipur.
A: The ₹1,743,000 estimate assumes normal soil; rocky or marshy land in Ukhrul may increase foundation costs.
A: Yes, premium emulsion painting is factored into the ₹1,743,000 estimate for your 840 sq ft home.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.