| Area of Construction | 870 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1805250 Rs. |
| Construction Cost in Lacs | ₹ 18.0525 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 870 Sq. ft. | 870 Sq. ft. | 870 Sq. ft. |
| Construction Estimate | ₹ 1548600 Rs. | ₹ 1696500 Rs. | ₹ 1957500 Rs. |
| Construction Cost in Lacs | ₹ 15.486 Lacs | ₹ 16.965 Lacs | ₹ 19.575 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 870 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1444200 Rs. |
| Construction Cost in Lacs | ₹ 14.442 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 870 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1392000 Rs. |
| Construction Cost in Lacs | ₹ 13.92 Lacs |
| Cost / Sq.ft | ₹ 1600 |
| Consideration | Construction Estimate / Cost is calculated based on the 870 Square feet of area , Construction Quality with using flooring and Ply Woodwork is 200 |
|---|
*The 870 sq ft area is for illustration purposes only. You can change based on your requirement.
A: Construction of a 870 sq ft Building property in Pherzawl typically takes 8-12 months within the ₹1,805,250 budget.
A: The roof slab for 870 sq ft in Pherzawl is one of the largest expenses within the ₹1,805,250 total.
A: The ₹1,805,250 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: It is most accurate for Pherzawl; other parts of Manipur may vary slightly from the ₹2,075 rate.
A: Tiling using Standard is calculated as part of the total ₹1,805,250 budget for Pherzawl.
A: Yes, the total of ₹1,805,250 for Pherzawl accounts for estimated GST on materials and construction services.
A: If No is excluded, the total for your 870 sq ft project in Pherzawl would be lower than the current ₹1,805,250.
A: Yes, due to material inflation in Manipur, the 2026 rate has reached ₹2,075 per sq ft.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.