| Area of Construction | 970 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 2012750 Rs. |
| Construction Cost in Lacs | ₹ 20.1 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 970 Sq. ft. | 970 Sq. ft. | 970 Sq. ft. |
| Construction Estimate | ₹ 1726600 Rs. | ₹ 1891500 Rs. | ₹ 2182500 Rs. |
| Construction Cost in Lacs | ₹ 17.266 Lacs | ₹ 18.915 Lacs | ₹ 21.825 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 970 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1610200 Rs. |
| Construction Cost in Lacs | ₹ 16.102 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 970 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1552000 Rs. |
| Construction Cost in Lacs | ₹ 15.52 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 970 Square feet of area
*The 970 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 970 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 340 | 408 | ₹ 138,720 |
| River Sand | Unit (100 CFT) | ₹ 7800 | 17.46 | ₹ 136,188 |
| M Sand | Unit (100 CFT) | ₹ 5500 | 17.46 | ₹ 96,030 |
| Clay Bricks | Piece | ₹ 11 | 9215 | ₹ 102,287 |
| Cement Blocks | Piece | ₹ 35 | 1164 | ₹ 40,740 |
| AAC Blocks | Cubic Meter | ₹ 44 | 33.95 | ₹ 1,494 |
| Gravel | Cubic Foot | ₹ 42 | 300.7 | ₹ 12,629 |
| TMT Steel | Ton | ₹ 57050 | 3.4 | ₹ 194,021 |
| Conduit Pipes | Rft | ₹ 39 | 1455 | ₹ 56,745 |
| Metal Boxes 6 Switches | Piece | ₹ 73 | 19.4 | ₹ 1,416 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1350 | 14.55 | ₹ 19,846 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5550 | - | - |
| Switches Lower Range | Piece | ₹ 28 | 145.5 | ₹ 4,074 |
| Switches High Range | Piece | ₹ 175 | - | - |
| Sockets | Piece | ₹ 12 | 97 | ₹ 1,164 |
| Dimmers | Piece | ₹ 290 | - | - |
| MCB | Piece | ₹ 280 | 9.7 | ₹ 2,697 |
| Pipes CPVC | Length | ₹ 390 | 145.5 | ₹ 56,600 |
| Pipes UPVC | Length | ₹ 300 | 116.4 | ₹ 34,687 |
| Pipes PVC | Length | ₹ 220 | 97 | ₹ 21,534 |
| UPVC | Length | ₹ 625 | - | - |
| Timber | Cubic Foot | ₹ 840 | 24.25 | ₹ 20,322 |
| Teak Wood | Cubic Foot | ₹ 1800 | - | - |
| Granite | Sq.Ft | ₹ 190 | 145.5 | ₹ 27,936 |
| Marbles | Sq.Ft | ₹ 370 | - | - |
| Tiles | Sq.Ft | ₹ 63 | 1261 | ₹ 79,443 |
| Paint Per Litre | Litre | ₹ 335 | 174.6 | ₹ 58,142 |
| Per Square Feet | Sq.Ft | ₹ 35 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1750 | - | - |
This cost estimate covers key locations such as Tezu, Sunpura, Wakro, Medo, Chongkham, Innao, Piyong, Namsai, Mahadevpur, Lathao, Momong, Chowkham, Lohitpur, Digaru, Demwe, Brahmakund, Parasuram Kund, Paya, Danglat, Tafragam.
In the plains-adjacent district of Tezu (Lohit), construction benefits from relatively better logistics via the Dhola-Sadiya bridge. For a 970 sqft Residential build totaling ₹2,012,750, the rate of ₹2075 per sqft reflects the demand for modern residential housing and the necessity of moisture-resistant materials. The Standard material selection focuses on durability and thermal comfort. Interior luxury featuring Vitrified Tiles flooring and customized Basic woodwork is standard. The soil is a mix of alluvium and boulders, requiring robust foundation engineering and superior damp-proofing to handle the high rainfall.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: The rate of ₹2,075 reflects 2026 market prices in Arunachal Pradesh for cement, steel, and local labor wages in Tezu.
A: In Tezu, Standard quality construction is currently priced at ₹2,075 per sq ft for 2026.
A: Professional plumbing is part of the ₹2,012,750 budget, averaging a fixed percentage of the ₹2,075 rate.
A: Adding a floor to a 970 sq ft building in Tezu is generally 20% cheaper than the initial ₹2,012,750 foundation-based cost.
A: For a 970 sq ft Building building in Tezu, the estimated budget for 2026 is ₹2,012,750.
A: Yes, standard window frames and shutters are part of the ₹2,012,750 estimate for your 970 sq ft build.
A: Yes, the ₹2,012,750 quote includes standard electrical wiring and modular points for a 970 sq ft area.
A: Standard internal wiring is included, but external EB deposit fees in Tezu are usually extra.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.