| Area of Construction | 830 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1722250 Rs. |
| Construction Cost in Lacs | ₹ 17.2 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 830 Sq. ft. | 830 Sq. ft. | 830 Sq. ft. |
| Construction Estimate | ₹ 1477400 Rs. | ₹ 1618500 Rs. | ₹ 1867500 Rs. |
| Construction Cost in Lacs | ₹ 14.774 Lacs | ₹ 16.185 Lacs | ₹ 18.675 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 830 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1377800 Rs. |
| Construction Cost in Lacs | ₹ 13.778 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 830 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1328000 Rs. |
| Construction Cost in Lacs | ₹ 13.28 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 830 Square feet of area
*The 830 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 830 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 349 | ₹ 122,150 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 14.94 | ₹ 121,014 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 14.94 | ₹ 85,158 |
| Clay Bricks | Piece | ₹ 12 | 7885 | ₹ 91,466 |
| Cement Blocks | Piece | ₹ 37 | 996 | ₹ 36,852 |
| AAC Blocks | Cubic Meter | ₹ 46 | 29.05 | ₹ 1,336 |
| Gravel | Cubic Foot | ₹ 44 | 257.3 | ₹ 11,321 |
| TMT Steel | Ton | ₹ 59350 | 2.91 | ₹ 172,636 |
| Conduit Pipes | Rft | ₹ 41 | 1245 | ₹ 51,045 |
| Metal Boxes 6 Switches | Piece | ₹ 76 | 16.6 | ₹ 1,262 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 12.45 | ₹ 17,654 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5750 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 124.5 | ₹ 3,611 |
| Switches High Range | Piece | ₹ 185 | - | - |
| Sockets | Piece | ₹ 13 | 83 | ₹ 1,079 |
| Dimmers | Piece | ₹ 300 | - | - |
| MCB | Piece | ₹ 290 | 8.3 | ₹ 2,399 |
| Pipes CPVC | Length | ₹ 405 | 124.5 | ₹ 50,298 |
| Pipes UPVC | Length | ₹ 310 | 99.6 | ₹ 30,876 |
| Pipes PVC | Length | ₹ 230 | 83 | ₹ 19,173 |
| UPVC | Length | ₹ 650 | - | - |
| Timber | Cubic Foot | ₹ 870 | 20.75 | ₹ 18,094 |
| Teak Wood | Cubic Foot | ₹ 1900 | - | - |
| Granite | Sq.Ft | ₹ 200 | 124.5 | ₹ 24,900 |
| Marbles | Sq.Ft | ₹ 385 | - | - |
| Tiles | Sq.Ft | ₹ 65 | 1079 | ₹ 70,135 |
| Paint Per Litre | Litre | ₹ 345 | 149.4 | ₹ 51,842 |
| Per Square Feet | Sq.Ft | ₹ 37 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1850 | - | - |
This cost estimate covers key locations such as Asifabad, Kagaznagar, Sirpur, Rebbena, Bejjur, Dahegaon, Jainoor, Kerameri, Kouthala, Lingapur, Penchikalpet, Tiryani, Wankidi, Sirpur-T, Kagaznagar Town, Easgaon, Babapur, Gundi, Khairgaon, Mowad.
In Komaram Bheem (Asifabad), construction is shaped by the hilly terrain and the dense forest covers of the northern tribal belt. For a 830 sqft Residential build reaching ₹1,722,250, the rate of ₹2075 per sqft reflects the logistical challenges of material transport through undulating landscapes. The Standard material selection focuses on durability and resilience against the high rainfall of the region. Interior features like Vitrified Tiles flooring and Basic woodwork are chosen for their functional strength. The soil is a mix of rocky strata and forest loam, providing good load-bearing capacity in elevated areas but requiring careful site leveling. For builders in Komaram Bheem, leveraging locally available stone aggregates while ensuring a steady supply of branded cement from Mancherial is key to maintaining project timelines.
Construction in developing regions presents a unique set of variables, primarily centered around infrastructure development and supply chain reach. While labor is often very cost-effective and readily available, material procurement might require transporting goods from distant city centers, which can slightly increase transportation costs. However, the lower cost of land and fewer administrative hurdles often offset these logistical premiums. These projects often involve working with localized material resources, which requires careful planning to ensure the quality matches modern building standards. This tier represents a highly pragmatic approach, focusing on providing essential, robust infrastructure while maintaining high affordability for the local population.
A: The choice depends on your preference, but both are compatible with the ₹1,722,250 budget for Komaram Bheem.
A: In Telangana, particularly in Komaram Bheem, the rate is ₹2,075 per sq ft for 2026.
A: Yes, the total of ₹1,722,250 for Komaram Bheem accounts for estimated GST on materials and construction services.
A: Yes, premium emulsion painting is factored into the ₹1,722,250 estimate for your 830 sq ft home.
A: Standard architectural elevation is included in the ₹1,722,250 construction estimate for Komaram Bheem.
A: A 1200 sq ft house in Komaram Bheem would follow the same ₹2,075 per sq ft logic as your 830 sq ft estimate.
A: The roof slab for 830 sq ft in Komaram Bheem is one of the largest expenses within the ₹1,722,250 total.
A: For a 830 sq ft Building building in Komaram Bheem, the estimated budget for 2026 is ₹1,722,250.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.