| Area of Construction | 820 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1701500 Rs. |
| Construction Cost in Lacs | ₹ 17.0 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 820 Sq. ft. | 820 Sq. ft. | 820 Sq. ft. |
| Construction Estimate | ₹ 1459600 Rs. | ₹ 1599000 Rs. | ₹ 1845000 Rs. |
| Construction Cost in Lacs | ₹ 14.596 Lacs | ₹ 15.99 Lacs | ₹ 18.45 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 820 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1361200 Rs. |
| Construction Cost in Lacs | ₹ 13.612 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 820 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1312000 Rs. |
| Construction Cost in Lacs | ₹ 13.12 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 820 Square feet of area
*The 820 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 820 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 330 | 345 | ₹ 113,850 |
| River Sand | Unit (100 CFT) | ₹ 7700 | 14.76 | ₹ 113,652 |
| M Sand | Unit (100 CFT) | ₹ 5400 | 14.76 | ₹ 79,704 |
| Clay Bricks | Piece | ₹ 11 | 7790 | ₹ 84,911 |
| Cement Blocks | Piece | ₹ 35 | 984 | ₹ 34,440 |
| AAC Blocks | Cubic Meter | ₹ 44 | 28.7 | ₹ 1,263 |
| Gravel | Cubic Foot | ₹ 42 | 254.2 | ₹ 10,676 |
| TMT Steel | Ton | ₹ 55950 | 2.87 | ₹ 160,533 |
| Conduit Pipes | Rft | ₹ 39 | 1230 | ₹ 47,970 |
| Metal Boxes 6 Switches | Piece | ₹ 71 | 16.4 | ₹ 1,164 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1350 | 12.3 | ₹ 16,445 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5450 | - | - |
| Switches Lower Range | Piece | ₹ 28 | 123 | ₹ 3,444 |
| Switches High Range | Piece | ₹ 175 | - | - |
| Sockets | Piece | ₹ 12 | 82 | ₹ 984 |
| Dimmers | Piece | ₹ 280 | - | - |
| MCB | Piece | ₹ 270 | 8.2 | ₹ 2,230 |
| Pipes CPVC | Length | ₹ 380 | 123 | ₹ 46,863 |
| Pipes UPVC | Length | ₹ 290 | 98.4 | ₹ 28,733 |
| Pipes PVC | Length | ₹ 220 | 82 | ₹ 17,876 |
| UPVC | Length | ₹ 615 | - | - |
| Timber | Cubic Foot | ₹ 820 | 20.5 | ₹ 16,851 |
| Teak Wood | Cubic Foot | ₹ 1800 | - | - |
| Granite | Sq.Ft | ₹ 190 | 123 | ₹ 23,124 |
| Marbles | Sq.Ft | ₹ 360 | - | - |
| Tiles | Sq.Ft | ₹ 61 | 1066 | ₹ 65,026 |
| Paint Per Litre | Litre | ₹ 325 | 147.6 | ₹ 48,265 |
| Per Square Feet | Sq.Ft | ₹ 35 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1750 | - | - |
This cost estimate covers key locations such as Wokha Town, Bhandari, Sanis, Ralan, Chukitong, Englan, Wokha Sadar, Baghty, Merapani Road, Vankhosung, Mount Tiyi Area, Doyang Dam Area, Longsa, Pangti, Lakhuti, Akuk, Riphyim, Wokha Village, Police Point Area, Likya Colony.
Building in Wokha involves managing construction in a hilly landscape known for its orange orchards and water bodies. For a 820 sqft Residential project totaling ₹1,701,500, the rate of ₹2075 per sqft reflects the logistical costs of transport from the plains and the need for earthquake-resistant RCC frames. The Standard material choice focuses on structural durability and moisture protection. Interior luxury often includes Vitrified Tiles flooring and customized Basic woodwork. The soil is predominantly stable rocky strata, but builders must prioritize high-quality retaining structures to handle the heavy seasonal monsoons.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: The choice depends on your preference, but both are compatible with the ₹1,701,500 budget for Wokha.
A: Yes, the ₹1,701,500 estimate covers the entire build from the foundation to the final Standard finish in Wokha.
A: The estimate of ₹1,701,500 is based on current 2026 material rates in Wokha and may vary with market shifts.
A: A 1200 sq ft house in Wokha would follow the same ₹2,075 per sq ft logic as your 820 sq ft estimate.
A: In Nagaland, particularly in Wokha, the rate is ₹2,075 per sq ft for 2026.
A: In Wokha, Building construction is optimized for its specific use, resulting in the current ₹2,075 rate.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,701,500 budget in Wokha.
A: The roof slab for 820 sq ft in Wokha is one of the largest expenses within the ₹1,701,500 total.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.