| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1950500 Rs. |
| Construction Cost in Lacs | ₹ 19.5 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 940 Sq. ft. | 940 Sq. ft. | 940 Sq. ft. |
| Construction Estimate | ₹ 1673200 Rs. | ₹ 1833000 Rs. | ₹ 2115000 Rs. |
| Construction Cost in Lacs | ₹ 16.732 Lacs | ₹ 18.33 Lacs | ₹ 21.15 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1560400 Rs. |
| Construction Cost in Lacs | ₹ 15.604 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1504000 Rs. |
| Construction Cost in Lacs | ₹ 15.04 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 940 Square feet of area
*The 940 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 940 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 395 | ₹ 138,250 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 16.92 | ₹ 137,052 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 16.92 | ₹ 96,444 |
| Clay Bricks | Piece | ₹ 12 | 8930 | ₹ 103,588 |
| Cement Blocks | Piece | ₹ 37 | 1128 | ₹ 41,736 |
| AAC Blocks | Cubic Meter | ₹ 46 | 32.9 | ₹ 1,513 |
| Gravel | Cubic Foot | ₹ 44 | 291.4 | ₹ 12,822 |
| TMT Steel | Ton | ₹ 59350 | 3.29 | ₹ 195,179 |
| Conduit Pipes | Rft | ₹ 41 | 1410 | ₹ 57,810 |
| Metal Boxes 6 Switches | Piece | ₹ 76 | 18.8 | ₹ 1,429 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 14.1 | ₹ 19,994 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5750 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 141 | ₹ 4,089 |
| Switches High Range | Piece | ₹ 185 | - | - |
| Sockets | Piece | ₹ 13 | 94 | ₹ 1,222 |
| Dimmers | Piece | ₹ 300 | - | - |
| MCB | Piece | ₹ 290 | 9.4 | ₹ 2,717 |
| Pipes CPVC | Length | ₹ 405 | 141 | ₹ 56,964 |
| Pipes UPVC | Length | ₹ 310 | 112.8 | ₹ 34,968 |
| Pipes PVC | Length | ₹ 230 | 94 | ₹ 21,714 |
| UPVC | Length | ₹ 650 | - | - |
| Timber | Cubic Foot | ₹ 870 | 23.5 | ₹ 20,492 |
| Teak Wood | Cubic Foot | ₹ 1900 | - | - |
| Granite | Sq.Ft | ₹ 200 | 141 | ₹ 28,200 |
| Marbles | Sq.Ft | ₹ 385 | - | - |
| Tiles | Sq.Ft | ₹ 65 | 1222 | ₹ 79,430 |
| Paint Per Litre | Litre | ₹ 345 | 169.2 | ₹ 58,712 |
| Per Square Feet | Sq.Ft | ₹ 37 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1850 | - | - |
This cost estimate covers key locations such as Vidisha Town, Ganj Basoda, Sironj, Kurwai, Lateri, Nateran, Gyaraspur, Gulabganj, Tyonda, Vidisha Rural, Bhopal Road, Sagar Road, Guna Road, Station Area, Civil Lines, Ahmedpur Road, Puranpura, Durga Nagar, Madhavganj, Sherpura.
Building in Vidisha involves managing construction in an agrarian hub with significant historical importance and varying topography. For a 940 sqft Residential project totaling ₹1,950,500, the rate of ₹2075 per sqft reflects the logistical ease of sourcing materials and the demand for quality housing. The Standard material selection focuses on structural durability and thermal efficiency. Interior luxury often includes Vitrified Tiles flooring and Basic woodwork. The soil varies from stable rocky strata to black cotton patches, requiring site-specific foundation designs and robust external plastering to handle the intense summer heat typical of the region.
Developed districts offer a predictable construction environment where local labor markets are well-established and highly reliable. These regions have a consistent supply of construction materials sourced from regional distributors, minimizing the risk of supply chain disruptions. Because these areas have stable growth, municipal processes and building approvals are often smoother compared to rapidly expanding cities. Builders can rely on long-standing relationships with local suppliers and contractors, which helps in keeping the overall project cost manageable and transparent. The pricing in this tier is designed to reflect the balance between professional-grade construction quality and the relative stability of the regional economic market.
A: Yes, the ₹1,950,500 estimate covers the entire build from the foundation to the final Standard finish in Vidisha.
A: Yes, due to material inflation in Madhya Pradesh, the 2026 rate has reached ₹2,075 per sq ft.
A: A standard overhead tank is included, but large underground sumps in Vidisha are usually extra.
A: Professional plumbing is part of the ₹1,950,500 budget, averaging a fixed percentage of the ₹2,075 rate.
A: It is most accurate for Vidisha; other parts of Madhya Pradesh may vary slightly from the ₹2,075 rate.
A: The ₹2,075 rate covers civil work, internal plastering, electrical wiring, and plumbing for your Vidisha project.
A: Given the current ₹2,075 rate in Vidisha, starting in 2026 helps avoid future material price hikes in Madhya Pradesh.
A: The ₹1,950,500 total is for the 940 sq ft built-up area; compound walls are usually calculated separately.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.