| Area of Construction | 850 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1763750 Rs. |
| Construction Cost in Lacs | ₹ 17.6 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 850 Sq. ft. | 850 Sq. ft. | 850 Sq. ft. |
| Construction Estimate | ₹ 1513000 Rs. | ₹ 1657500 Rs. | ₹ 1912500 Rs. |
| Construction Cost in Lacs | ₹ 15.13 Lacs | ₹ 16.575 Lacs | ₹ 19.125 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 850 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1411000 Rs. |
| Construction Cost in Lacs | ₹ 14.11 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 850 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1360000 Rs. |
| Construction Cost in Lacs | ₹ 13.6 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 850 Square feet of area
*The 850 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 850 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 357 | ₹ 124,950 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 15.3 | ₹ 123,930 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 15.3 | ₹ 87,210 |
| Clay Bricks | Piece | ₹ 12 | 8075 | ₹ 93,670 |
| Cement Blocks | Piece | ₹ 37 | 1020 | ₹ 37,740 |
| AAC Blocks | Cubic Meter | ₹ 46 | 29.75 | ₹ 1,369 |
| Gravel | Cubic Foot | ₹ 44 | 263.5 | ₹ 11,594 |
| TMT Steel | Ton | ₹ 59350 | 2.98 | ₹ 176,789 |
| Conduit Pipes | Rft | ₹ 41 | 1275 | ₹ 52,275 |
| Metal Boxes 6 Switches | Piece | ₹ 76 | 17 | ₹ 1,292 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 12.75 | ₹ 18,080 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5750 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 127.5 | ₹ 3,698 |
| Switches High Range | Piece | ₹ 185 | - | - |
| Sockets | Piece | ₹ 13 | 85 | ₹ 1,105 |
| Dimmers | Piece | ₹ 300 | - | - |
| MCB | Piece | ₹ 290 | 8.5 | ₹ 2,457 |
| Pipes CPVC | Length | ₹ 405 | 127.5 | ₹ 51,510 |
| Pipes UPVC | Length | ₹ 310 | 102 | ₹ 31,620 |
| Pipes PVC | Length | ₹ 230 | 85 | ₹ 19,635 |
| UPVC | Length | ₹ 650 | - | - |
| Timber | Cubic Foot | ₹ 870 | 21.25 | ₹ 18,530 |
| Teak Wood | Cubic Foot | ₹ 1900 | - | - |
| Granite | Sq.Ft | ₹ 200 | 127.5 | ₹ 25,500 |
| Marbles | Sq.Ft | ₹ 385 | - | - |
| Tiles | Sq.Ft | ₹ 65 | 1105 | ₹ 71,825 |
| Paint Per Litre | Litre | ₹ 345 | 153 | ₹ 53,091 |
| Per Square Feet | Sq.Ft | ₹ 37 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1850 | - | - |
This cost estimate covers key locations such as Tura Town, Phulbari, Dadenggre, Selsella, Tikrikilla, Rongram, Gambegre, Dalu, Garobadha, Chandmari, New Tura, Hawakhana, Araimile, Ringrey, Dobasipara, Dobu, Rajabala, Bhaitbari, Hallidayganj, Singimari.
As the largest town in the Garo Hills, construction in Tura is defined by its undulating hilly terrain and humid tropical climate. For a 850 sqft Residential build reaching ₹1,763,750, the rate of ₹2075 per sqft reflects the logistical premium and the demand for modern residential infrastructure. The Standard material choice focuses on moisture protection and structural longevity. Interior luxury featuring Vitrified Tiles flooring and customized Basic woodwork is standard. The soil is predominantly red laterite and rocky, providing a firm base for foundations. Builders focus on robust external finishes and efficient site drainage.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Standard is highly cost-effective for Tura and is included in your current ₹1,763,750 calculation.
A: The ₹1,763,750 total is for the 850 sq ft built-up area; compound walls are usually calculated separately.
A: Typically, 2 to 3 bathrooms are factored into the ₹1,763,750 budget for a 850 sq ft area.
A: For 2026, a 850 sq ft Building project in Tura is estimated at ₹1,763,750 using Standard quality materials.
A: A 1200 sq ft house in Tura would follow the same ₹2,075 per sq ft logic as your 850 sq ft estimate.
A: Roughly 400-500 bags are required for a 850 sq ft build in Tura, included in the ₹1,763,750 price.
A: In Meghalaya, particularly in Tura, the rate is ₹2,075 per sq ft for 2026.
A: Yes, the ₹1,763,750 budget includes essential water proofing for the terrace and bathrooms in Tura.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.