| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 2054250 Rs. |
| Construction Cost in Lacs | ₹ 20.5 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 990 Sq. ft. | 990 Sq. ft. | 990 Sq. ft. |
| Construction Estimate | ₹ 1762200 Rs. | ₹ 1930500 Rs. | ₹ 2227500 Rs. |
| Construction Cost in Lacs | ₹ 17.622 Lacs | ₹ 19.305 Lacs | ₹ 22.275 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1643400 Rs. |
| Construction Cost in Lacs | ₹ 16.434 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1584000 Rs. |
| Construction Cost in Lacs | ₹ 15.84 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 990 Square feet of area
*The 990 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 990 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 416 | ₹ 145,600 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 17.82 | ₹ 144,342 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 17.82 | ₹ 101,574 |
| Clay Bricks | Piece | ₹ 11 | 9405 | ₹ 107,217 |
| Cement Blocks | Piece | ₹ 36 | 1188 | ₹ 42,768 |
| AAC Blocks | Cubic Meter | ₹ 46 | 34.65 | ₹ 1,594 |
| Gravel | Cubic Foot | ₹ 44 | 306.9 | ₹ 13,504 |
| TMT Steel | Ton | ₹ 58750 | 3.47 | ₹ 203,897 |
| Conduit Pipes | Rft | ₹ 41 | 1485 | ₹ 60,885 |
| Metal Boxes 6 Switches | Piece | ₹ 75 | 19.8 | ₹ 1,485 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 14.85 | ₹ 20,849 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5700 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 148.5 | ₹ 4,307 |
| Switches High Range | Piece | ₹ 180 | - | - |
| Sockets | Piece | ₹ 12 | 99 | ₹ 1,188 |
| Dimmers | Piece | ₹ 295 | - | - |
| MCB | Piece | ₹ 285 | 9.9 | ₹ 2,831 |
| Pipes CPVC | Length | ₹ 400 | 148.5 | ₹ 59,400 |
| Pipes UPVC | Length | ₹ 305 | 118.8 | ₹ 36,472 |
| Pipes PVC | Length | ₹ 230 | 99 | ₹ 22,671 |
| UPVC | Length | ₹ 645 | - | - |
| Timber | Cubic Foot | ₹ 865 | 24.75 | ₹ 21,359 |
| Teak Wood | Cubic Foot | ₹ 1850 | - | - |
| Granite | Sq.Ft | ₹ 200 | 148.5 | ₹ 29,403 |
| Marbles | Sq.Ft | ₹ 380 | - | - |
| Tiles | Sq.Ft | ₹ 64 | 1287 | ₹ 82,368 |
| Paint Per Litre | Litre | ₹ 345 | 178.2 | ₹ 61,123 |
| Per Square Feet | Sq.Ft | ₹ 36 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1800 | - | - |
This cost estimate covers key locations such as Tuensang Town, Shamator, Noklak Road, Longkhim, Noksen, Chare, Chessore, Thonoknyu, Sangsangnyu, Tuensang Sadar, Bazar Ward, Post Office Ward, Sector 1-4, Khel Area, Konya Village, Ngangpong, Helipong, Chingmelen, Sangphur, Chessore Town.
In Tuensang, the largest eastern district, construction is shaped by logistical hurdles and the requirement for reinforced structural designs. For a 990 sqft Residential build reaching ₹2,054,250, the rate of ₹2075 per sqft reflects the higher cost of material delivery and the need for thermal mass. The Standard material selection focuses on structural strength and moisture resistance. Interior finishes like Vitrified Tiles flooring and Basic woodwork are standard. The soil is predominantly stable and rocky, offering firm foundation support. Builders focus on robust external finishes and efficient site drainage to handle the seasonal variations.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: A standard overhead tank is included, but large underground sumps in Tuensang are usually extra.
A: Yes, due to material inflation in Nagaland, the 2026 rate has reached ₹2,075 per sq ft.
A: You can lower the ₹2,054,250 budget by opting for basic materials or removing the No component.
A: Yes, our 2026 estimate of ₹2,054,250 for Tuensang assumes the use of high-quality M-Sand.
A: Labor rates are factored into the ₹2,075 per sq ft price, which is standard for the Tuensang region in 2026.
A: Yes, the ₹2,054,250 budget includes essential water proofing for the terrace and bathrooms in Tuensang.
A: The ₹2,054,250 estimate assumes normal soil; rocky or marshy land in Tuensang may increase foundation costs.
A: Tiling using Standard is calculated as part of the total ₹2,054,250 budget for Tuensang.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.