| Area of Construction | 860 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1784500 Rs. |
| Construction Cost in Lacs | ₹ 17.845 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 860 Sq. ft. | 860 Sq. ft. | 860 Sq. ft. |
| Construction Estimate | ₹ 1530800 Rs. | ₹ 1677000 Rs. | ₹ 1935000 Rs. |
| Construction Cost in Lacs | ₹ 15.308 Lacs | ₹ 16.77 Lacs | ₹ 19.35 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 860 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1427600 Rs. |
| Construction Cost in Lacs | ₹ 14.276 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 860 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1376000 Rs. |
| Construction Cost in Lacs | ₹ 13.76 Lacs |
| Cost / Sq.ft | ₹ 1600 |
| Consideration | Construction Estimate / Cost is calculated based on the 860 Square feet of area , Construction Quality with using flooring and Ply Woodwork is 200 |
|---|
*The 860 sq ft area is for illustration purposes only. You can change based on your requirement.
A: Adding a floor to a 860 sq ft building in Rajouri Garden is generally 20% cheaper than the initial ₹1,784,500 foundation-based cost.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,784,500 budget in Rajouri Garden.
A: If No was selected as "Yes", it is included in your ₹1,784,500 total.
A: The estimate of ₹1,784,500 is based on current 2026 material rates in Rajouri Garden and may vary with market shifts.
A: Tiling using Standard is calculated as part of the total ₹1,784,500 budget for Rajouri Garden.
A: The ₹1,784,500 total is for the 860 sq ft built-up area; compound walls are usually calculated separately.
A: In Rajouri Garden, Building construction is optimized for its specific use, resulting in the current ₹2,075 rate.
A: If No is excluded, the total for your 860 sq ft project in Rajouri Garden would be lower than the current ₹1,784,500.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.