| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 2054250 Rs. |
| Construction Cost in Lacs | ₹ 20.5 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 990 Sq. ft. | 990 Sq. ft. | 990 Sq. ft. |
| Construction Estimate | ₹ 1762200 Rs. | ₹ 1930500 Rs. | ₹ 2227500 Rs. |
| Construction Cost in Lacs | ₹ 17.622 Lacs | ₹ 19.305 Lacs | ₹ 22.275 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1643400 Rs. |
| Construction Cost in Lacs | ₹ 16.434 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 990 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1584000 Rs. |
| Construction Cost in Lacs | ₹ 15.84 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 990 Square feet of area
*The 990 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 990 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 320 | 416 | ₹ 133,120 |
| River Sand | Unit (100 CFT) | ₹ 7500 | 17.82 | ₹ 133,650 |
| M Sand | Unit (100 CFT) | ₹ 5300 | 17.82 | ₹ 94,446 |
| Clay Bricks | Piece | ₹ 11 | 9405 | ₹ 100,634 |
| Cement Blocks | Piece | ₹ 34 | 1188 | ₹ 40,392 |
| AAC Blocks | Cubic Meter | ₹ 43 | 34.65 | ₹ 1,490 |
| Gravel | Cubic Foot | ₹ 41 | 306.9 | ₹ 12,583 |
| TMT Steel | Ton | ₹ 54800 | 3.47 | ₹ 190,173 |
| Conduit Pipes | Rft | ₹ 38 | 1485 | ₹ 56,430 |
| Metal Boxes 6 Switches | Piece | ₹ 70 | 19.8 | ₹ 1,386 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 14.85 | ₹ 19,454 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5300 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 148.5 | ₹ 4,010 |
| Switches High Range | Piece | ₹ 170 | - | - |
| Sockets | Piece | ₹ 12 | 99 | ₹ 1,188 |
| Dimmers | Piece | ₹ 275 | - | - |
| MCB | Piece | ₹ 265 | 9.9 | ₹ 2,643 |
| Pipes CPVC | Length | ₹ 375 | 148.5 | ₹ 55,391 |
| Pipes UPVC | Length | ₹ 285 | 118.8 | ₹ 33,977 |
| Pipes PVC | Length | ₹ 215 | 99 | ₹ 21,087 |
| UPVC | Length | ₹ 600 | - | - |
| Timber | Cubic Foot | ₹ 805 | 24.75 | ₹ 19,924 |
| Teak Wood | Cubic Foot | ₹ 1750 | - | - |
| Granite | Sq.Ft | ₹ 185 | 148.5 | ₹ 27,324 |
| Marbles | Sq.Ft | ₹ 355 | - | - |
| Tiles | Sq.Ft | ₹ 60 | 1287 | ₹ 77,220 |
| Paint Per Litre | Litre | ₹ 320 | 178.2 | ₹ 57,024 |
| Per Square Feet | Sq.Ft | ₹ 34 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1700 | - | - |
This cost estimate covers key locations such as Phek Town, Pfutsero, Meluri, Chozuba, Chetheba, Sekruzu, Razeba, Khezhakeno, Chizami, Sakraba, Phek Sadar, Lozaphuhu, Akhegwo, Phor, Kizari, Pholami, Kikruma, Pfutsero Town, Phek Village, Jessami Road.
Construction in Phek is defined by its high-altitude terrain and the requirement for high-grade seismic engineering (Zone V). For a 990 sqft Residential project totaling ₹2,054,250, the rate of ₹2075 per sqft accounts for the logistical costs of material transport and the demand for thermal efficiency. The Standard material selection focuses on durability and resilience against heavy rain. Interior luxury often includes local Basic woodwork and Vitrified Tiles flooring. The soil is predominantly rocky, providing an excellent base for foundations, provided that slope stabilization is properly managed to prevent landslides.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Yes, the ₹2,054,250 quote includes standard electrical wiring and modular points for a 990 sq ft area.
A: Steel prices in Phek are factored into the ₹2,075 rate for your 990 sq ft project.
A: Professional plumbing is part of the ₹2,054,250 budget, averaging a fixed percentage of the ₹2,075 rate.
A: Typically, 2 to 3 bathrooms are factored into the ₹2,054,250 budget for a 990 sq ft area.
A: Using AAC blocks can slightly reduce the civil portion of your ₹2,054,250 budget in Phek.
A: The ₹2,075 rate covers civil work, internal plastering, electrical wiring, and plumbing for your Phek project.
A: Borewell costs in Phek are separate from the building construction total of ₹2,054,250.
A: For 2026, a 990 sq ft Building project in Phek is estimated at ₹2,054,250 using Standard quality materials.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.