| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1950500 Rs. |
| Construction Cost in Lacs | ₹ 19.5 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 940 Sq. ft. | 940 Sq. ft. | 940 Sq. ft. |
| Construction Estimate | ₹ 1673200 Rs. | ₹ 1833000 Rs. | ₹ 2115000 Rs. |
| Construction Cost in Lacs | ₹ 16.732 Lacs | ₹ 18.33 Lacs | ₹ 21.15 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1560400 Rs. |
| Construction Cost in Lacs | ₹ 15.604 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1504000 Rs. |
| Construction Cost in Lacs | ₹ 15.04 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 940 Square feet of area
*The 940 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 940 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 320 | 395 | ₹ 126,400 |
| River Sand | Unit (100 CFT) | ₹ 7400 | 16.92 | ₹ 125,208 |
| M Sand | Unit (100 CFT) | ₹ 5200 | 16.92 | ₹ 87,984 |
| Clay Bricks | Piece | ₹ 11 | 8930 | ₹ 93,765 |
| Cement Blocks | Piece | ₹ 33 | 1128 | ₹ 37,224 |
| AAC Blocks | Cubic Meter | ₹ 42 | 32.9 | ₹ 1,382 |
| Gravel | Cubic Foot | ₹ 40 | 291.4 | ₹ 11,656 |
| TMT Steel | Ton | ₹ 53700 | 3.29 | ₹ 176,591 |
| Conduit Pipes | Rft | ₹ 37 | 1410 | ₹ 52,170 |
| Metal Boxes 6 Switches | Piece | ₹ 68 | 18.8 | ₹ 1,278 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 14.1 | ₹ 18,090 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5200 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 141 | ₹ 3,807 |
| Switches High Range | Piece | ₹ 165 | - | - |
| Sockets | Piece | ₹ 11 | 94 | ₹ 1,034 |
| Dimmers | Piece | ₹ 270 | - | - |
| MCB | Piece | ₹ 260 | 9.4 | ₹ 2,453 |
| Pipes CPVC | Length | ₹ 365 | 141 | ₹ 51,606 |
| Pipes UPVC | Length | ₹ 280 | 112.8 | ₹ 31,584 |
| Pipes PVC | Length | ₹ 210 | 94 | ₹ 19,646 |
| UPVC | Length | ₹ 590 | - | - |
| Timber | Cubic Foot | ₹ 790 | 23.5 | ₹ 18,542 |
| Teak Wood | Cubic Foot | ₹ 1700 | - | - |
| Granite | Sq.Ft | ₹ 180 | 141 | ₹ 25,521 |
| Marbles | Sq.Ft | ₹ 345 | - | - |
| Tiles | Sq.Ft | ₹ 59 | 1222 | ₹ 72,098 |
| Paint Per Litre | Litre | ₹ 315 | 169.2 | ₹ 53,129 |
| Per Square Feet | Sq.Ft | ₹ 33 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1650 | - | - |
This cost estimate covers key locations such as Mon Town, Naginimora, Tizit, Aboi, Tobu, Chen, Mopong, Phomching, Angjangyang, Wakching, Mon Village, Kongan, Shangnyu, Longwa, Totok, Lampong Sheanghah, Jakphang, Chenwetnyu, Lungwa Border Area, Mon Sadar.
Construction in Mon is shaped by its unique cultural landscape and the logistical costs associated with the border region. For a 940 sqft Residential build reaching ₹1,950,500, the rate of ₹2075 per sqft accounts for the transport of materials and the need for earthquake-resistant designs. The Standard material selection focuses on durability and structural strength. Interior finishes like Vitrified Tiles flooring and Basic woodwork are standard. The soil is predominantly rocky and stable, offering good load-bearing capacity, though builders must focus on superior weather-shielding to protect against the high humidity and seasonal rain.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Yes, standard window frames and shutters are part of the ₹1,950,500 estimate for your 940 sq ft build.
A: Professional plumbing is part of the ₹1,950,500 budget, averaging a fixed percentage of the ₹2,075 rate.
A: Yes, our 2026 estimate of ₹1,950,500 for Mon assumes the use of high-quality M-Sand.
A: Standard internal wiring is included, but external EB deposit fees in Mon are usually extra.
A: The ₹1,950,500 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,950,500 budget in Mon.
A: While we provide the ₹1,950,500 cost, we recommend consulting a Mon architect for the actual 940 sq ft plan.
A: Choosing Standard quality results in a total of ₹1,950,500 for 940 sq ft, ensuring specific material standards for Mon.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.