| Area of Construction | 780 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1618500 Rs. |
| Construction Cost in Lacs | ₹ 16.2 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 780 Sq. ft. | 780 Sq. ft. | 780 Sq. ft. |
| Construction Estimate | ₹ 1388400 Rs. | ₹ 1521000 Rs. | ₹ 1755000 Rs. |
| Construction Cost in Lacs | ₹ 13.884 Lacs | ₹ 15.21 Lacs | ₹ 17.55 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 780 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1294800 Rs. |
| Construction Cost in Lacs | ₹ 12.948 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 780 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1248000 Rs. |
| Construction Cost in Lacs | ₹ 12.48 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 780 Square feet of area
*The 780 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 780 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 320 | 328 | ₹ 104,960 |
| River Sand | Unit (100 CFT) | ₹ 7400 | 14.04 | ₹ 103,896 |
| M Sand | Unit (100 CFT) | ₹ 5200 | 14.04 | ₹ 73,008 |
| Clay Bricks | Piece | ₹ 11 | 7410 | ₹ 77,805 |
| Cement Blocks | Piece | ₹ 33 | 936 | ₹ 30,888 |
| AAC Blocks | Cubic Meter | ₹ 42 | 27.3 | ₹ 1,147 |
| Gravel | Cubic Foot | ₹ 40 | 241.8 | ₹ 9,672 |
| TMT Steel | Ton | ₹ 53700 | 2.73 | ₹ 146,533 |
| Conduit Pipes | Rft | ₹ 37 | 1170 | ₹ 43,290 |
| Metal Boxes 6 Switches | Piece | ₹ 68 | 15.6 | ₹ 1,061 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 11.7 | ₹ 15,011 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5200 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 117 | ₹ 3,159 |
| Switches High Range | Piece | ₹ 165 | - | - |
| Sockets | Piece | ₹ 11 | 78 | ₹ 858 |
| Dimmers | Piece | ₹ 270 | - | - |
| MCB | Piece | ₹ 260 | 7.8 | ₹ 2,036 |
| Pipes CPVC | Length | ₹ 365 | 117 | ₹ 42,822 |
| Pipes UPVC | Length | ₹ 280 | 93.6 | ₹ 26,208 |
| Pipes PVC | Length | ₹ 210 | 78 | ₹ 16,302 |
| UPVC | Length | ₹ 590 | - | - |
| Timber | Cubic Foot | ₹ 790 | 19.5 | ₹ 15,386 |
| Teak Wood | Cubic Foot | ₹ 1700 | - | - |
| Granite | Sq.Ft | ₹ 180 | 117 | ₹ 21,177 |
| Marbles | Sq.Ft | ₹ 345 | - | - |
| Tiles | Sq.Ft | ₹ 59 | 1014 | ₹ 59,826 |
| Paint Per Litre | Litre | ₹ 315 | 140.4 | ₹ 44,086 |
| Per Square Feet | Sq.Ft | ₹ 33 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1650 | - | - |
This cost estimate covers key locations such as Lunglei Town, Hnahthial, Tlabung, Lungsen, Bunghmun, Tawipui, Thenhlum, Haulawng, Lunglei Venglai, Bazar Veng, Chanmari (Lunglei), Rahsi Veng, Salem Veng, Zotlang, Electric Veng, Farm Veng, Pukpui, Thusang, Mualthuam, Lungmawi.
As the second-largest town, construction in Lunglei is defined by its steep hilly terrain and administrative importance in southern Mizoram. For a 780 sqft Residential project totaling ₹1,618,500, the rate of ₹2075 per sqft reflects the logistical premium and the requirement for high-grade RCC engineering. The Standard material selection focuses on durability and seismic resilience. Interior luxury featuring Vitrified Tiles flooring and customized Basic woodwork is common. The soil is predominantly stable rocky strata, requiring expert slope stabilization and robust external plastering to manage the humid climate and seasonal tremors.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,618,500 budget in Lunglei.
A: The ₹1,618,500 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: It is most accurate for Lunglei; other parts of Mizoram may vary slightly from the ₹2,075 rate.
A: Construction of a 780 sq ft Building property in Lunglei typically takes 8-12 months within the ₹1,618,500 budget.
A: Given the current ₹2,075 rate in Lunglei, starting in 2026 helps avoid future material price hikes in Mizoram.
A: The estimate of ₹1,618,500 is based on current 2026 material rates in Lunglei and may vary with market shifts.
A: The ₹2,075 rate covers civil work, internal plastering, electrical wiring, and plumbing for your Lunglei project.
A: A standard overhead tank is included, but large underground sumps in Lunglei are usually extra.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.