| Area of Construction | 750 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1556250 Rs. |
| Construction Cost in Lacs | ₹ 15.6 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 750 Sq. ft. | 750 Sq. ft. | 750 Sq. ft. |
| Construction Estimate | ₹ 1335000 Rs. | ₹ 1462500 Rs. | ₹ 1687500 Rs. |
| Construction Cost in Lacs | ₹ 13.35 Lacs | ₹ 14.625 Lacs | ₹ 16.875 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 750 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1245000 Rs. |
| Construction Cost in Lacs | ₹ 12.45 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 750 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1200000 Rs. |
| Construction Cost in Lacs | ₹ 12 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 750 Square feet of area
*The 750 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 750 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 315 | ₹ 110,250 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 13.5 | ₹ 109,350 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 13.5 | ₹ 76,950 |
| Clay Bricks | Piece | ₹ 12 | 7125 | ₹ 82,650 |
| Cement Blocks | Piece | ₹ 37 | 900 | ₹ 33,300 |
| AAC Blocks | Cubic Meter | ₹ 46 | 26.25 | ₹ 1,208 |
| Gravel | Cubic Foot | ₹ 44 | 232.5 | ₹ 10,230 |
| TMT Steel | Ton | ₹ 59350 | 2.63 | ₹ 156,025 |
| Conduit Pipes | Rft | ₹ 41 | 1125 | ₹ 46,125 |
| Metal Boxes 6 Switches | Piece | ₹ 76 | 15 | ₹ 1,140 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 11.25 | ₹ 15,953 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5750 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 112.5 | ₹ 3,263 |
| Switches High Range | Piece | ₹ 185 | - | - |
| Sockets | Piece | ₹ 13 | 75 | ₹ 975 |
| Dimmers | Piece | ₹ 300 | - | - |
| MCB | Piece | ₹ 290 | 7.5 | ₹ 2,168 |
| Pipes CPVC | Length | ₹ 405 | 112.5 | ₹ 45,450 |
| Pipes UPVC | Length | ₹ 310 | 90 | ₹ 27,900 |
| Pipes PVC | Length | ₹ 230 | 75 | ₹ 17,325 |
| UPVC | Length | ₹ 650 | - | - |
| Timber | Cubic Foot | ₹ 870 | 18.75 | ₹ 16,350 |
| Teak Wood | Cubic Foot | ₹ 1900 | - | - |
| Granite | Sq.Ft | ₹ 200 | 112.5 | ₹ 22,500 |
| Marbles | Sq.Ft | ₹ 385 | - | - |
| Tiles | Sq.Ft | ₹ 65 | 975 | ₹ 63,375 |
| Paint Per Litre | Litre | ₹ 345 | 135 | ₹ 46,845 |
| Per Square Feet | Sq.Ft | ₹ 37 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1850 | - | - |
This cost estimate covers key locations such as Likabali, Gensi, Kangku, Sibe, Nari, Seren, Koyu, Korang, Durpai, Malini, Nilukh, New Kamcham, Sikirari, Dibe, Bali, Garu, Gime, Torne, Tajgi, Sipu.
In Likabali (Lower Siang), construction is influenced by its role as a key transit point between the Assam plains and the Arunachal hills. For a 750 sqft Residential project totaling ₹1,556,250, the rate of ₹2075 per sqft reflects the logistical advantage of sourcing materials and the demand for sturdy residential units. The Standard material selection focuses on moisture resistance and thermal comfort. Interior aesthetics feature Vitrified Tiles flooring and Basic woodwork. The soil is predominantly stable loamy soil, requiring robust foundation footings and superior external waterproofing to handle the humid subtropical climate.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: The ₹1,556,250 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: The estimate of ₹1,556,250 is based on current 2026 material rates in Likabali and may vary with market shifts.
A: Labor rates are factored into the ₹2,075 per sq ft price, which is standard for the Likabali region in 2026.
A: In Likabali, Building construction is optimized for its specific use, resulting in the current ₹2,075 rate.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,556,250 budget in Likabali.
A: Given the current ₹2,075 rate in Likabali, starting in 2026 helps avoid future material price hikes in Arunachal Pradesh.
A: Yes, skilled labor in Likabali is required for Standard quality, which is reflected in the ₹2,075 rate.
A: Yes, due to material inflation in Arunachal Pradesh, the 2026 rate has reached ₹2,075 per sq ft.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.