| Area of Construction | 900 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1867500 Rs. |
| Construction Cost in Lacs | ₹ 18.7 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 900 Sq. ft. | 900 Sq. ft. | 900 Sq. ft. |
| Construction Estimate | ₹ 1602000 Rs. | ₹ 1755000 Rs. | ₹ 2025000 Rs. |
| Construction Cost in Lacs | ₹ 16.02 Lacs | ₹ 17.55 Lacs | ₹ 20.25 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 900 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1494000 Rs. |
| Construction Cost in Lacs | ₹ 14.94 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 900 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1440000 Rs. |
| Construction Cost in Lacs | ₹ 14.4 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 900 Square feet of area
*The 900 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 900 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 340 | 378 | ₹ 128,520 |
| River Sand | Unit (100 CFT) | ₹ 7800 | 16.2 | ₹ 126,360 |
| M Sand | Unit (100 CFT) | ₹ 5500 | 16.2 | ₹ 89,100 |
| Clay Bricks | Piece | ₹ 11 | 8550 | ₹ 94,050 |
| Cement Blocks | Piece | ₹ 35 | 1080 | ₹ 37,800 |
| AAC Blocks | Cubic Meter | ₹ 44 | 31.5 | ₹ 1,386 |
| Gravel | Cubic Foot | ₹ 42 | 279 | ₹ 11,718 |
| TMT Steel | Ton | ₹ 56500 | 3.15 | ₹ 177,975 |
| Conduit Pipes | Rft | ₹ 39 | 1350 | ₹ 52,650 |
| Metal Boxes 6 Switches | Piece | ₹ 72 | 18 | ₹ 1,296 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1350 | 13.5 | ₹ 18,225 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5500 | - | - |
| Switches Lower Range | Piece | ₹ 28 | 135 | ₹ 3,780 |
| Switches High Range | Piece | ₹ 175 | - | - |
| Sockets | Piece | ₹ 12 | 90 | ₹ 1,080 |
| Dimmers | Piece | ₹ 285 | - | - |
| MCB | Piece | ₹ 275 | 9 | ₹ 2,475 |
| Pipes CPVC | Length | ₹ 385 | 135 | ₹ 51,975 |
| Pipes UPVC | Length | ₹ 295 | 108 | ₹ 31,860 |
| Pipes PVC | Length | ₹ 220 | 90 | ₹ 19,800 |
| UPVC | Length | ₹ 620 | - | - |
| Timber | Cubic Foot | ₹ 830 | 22.5 | ₹ 18,675 |
| Teak Wood | Cubic Foot | ₹ 1800 | - | - |
| Granite | Sq.Ft | ₹ 190 | 135 | ₹ 25,650 |
| Marbles | Sq.Ft | ₹ 365 | - | - |
| Tiles | Sq.Ft | ₹ 62 | 1170 | ₹ 72,540 |
| Paint Per Litre | Litre | ₹ 330 | 162 | ₹ 53,460 |
| Per Square Feet | Sq.Ft | ₹ 35 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1750 | - | - |
This cost estimate covers key locations such as Lawngtlai Town, Sangau, Chawngte, Bungtlang South, Vaseitlang, Borapansury, Kamalanagar, Longpuighat, Lawngtlai Vengpui, Council Veng, Bazar Veng, Chandmary, College Veng, AOC Veng, Saikah, Paithar, Lungtian, Bualpui NG, Cheural, Sihtlangpui.
Construction in Lawngtlai is shaped by its rugged topography and the logistical costs associated with the Kaladan Multi-Modal Transit project. For a 900 sqft Residential build reaching ₹1,867,500, the rate of ₹2075 per sqft accounts for the transport of materials and the need for earthquake-resistant designs. The Standard material choice focuses on structural strength and moisture protection. Interior features include Vitrified Tiles flooring and Basic woodwork. The soil is predominantly rocky, offering firm foundation support, but builders must prioritize high-quality retaining structures and sloped roofing to withstand the intense monsoons.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: In Lawngtlai, Building construction is optimized for its specific use, resulting in the current ₹2,075 rate.
A: Construction of a 900 sq ft Building property in Lawngtlai typically takes 8-12 months within the ₹1,867,500 budget.
A: Choosing Standard quality results in a total of ₹1,867,500 for 900 sq ft, ensuring specific material standards for Lawngtlai.
A: The rate of ₹2,075 reflects 2026 market prices in Mizoram for cement, steel, and local labor wages in Lawngtlai.
A: Yes, the ₹1,867,500 quote includes standard electrical wiring and modular points for a 900 sq ft area.
A: It is most accurate for Lawngtlai; other parts of Mizoram may vary slightly from the ₹2,075 rate.
A: Car parking in Lawngtlai is typically billed at a lower per-sq-ft rate than the main ₹2,075 residential rate.
A: The estimate of ₹1,867,500 is based on current 2026 material rates in Lawngtlai and may vary with market shifts.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.