| Area of Construction | 960 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1992000 Rs. |
| Construction Cost in Lacs | ₹ 19.9 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 960 Sq. ft. | 960 Sq. ft. | 960 Sq. ft. |
| Construction Estimate | ₹ 1708800 Rs. | ₹ 1872000 Rs. | ₹ 2160000 Rs. |
| Construction Cost in Lacs | ₹ 17.088 Lacs | ₹ 18.72 Lacs | ₹ 21.6 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 960 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1593600 Rs. |
| Construction Cost in Lacs | ₹ 15.936 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 960 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1536000 Rs. |
| Construction Cost in Lacs | ₹ 15.36 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 960 Square feet of area
*The 960 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 960 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 350 | 404 | ₹ 141,400 |
| River Sand | Unit (100 CFT) | ₹ 8100 | 17.28 | ₹ 139,968 |
| M Sand | Unit (100 CFT) | ₹ 5700 | 17.28 | ₹ 98,496 |
| Clay Bricks | Piece | ₹ 12 | 9120 | ₹ 105,792 |
| Cement Blocks | Piece | ₹ 37 | 1152 | ₹ 42,624 |
| AAC Blocks | Cubic Meter | ₹ 46 | 33.6 | ₹ 1,546 |
| Gravel | Cubic Foot | ₹ 44 | 297.6 | ₹ 13,094 |
| TMT Steel | Ton | ₹ 59350 | 3.36 | ₹ 199,332 |
| Conduit Pipes | Rft | ₹ 41 | 1440 | ₹ 59,040 |
| Metal Boxes 6 Switches | Piece | ₹ 76 | 19.2 | ₹ 1,459 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1400 | 14.4 | ₹ 20,419 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5750 | - | - |
| Switches Lower Range | Piece | ₹ 29 | 144 | ₹ 4,176 |
| Switches High Range | Piece | ₹ 185 | - | - |
| Sockets | Piece | ₹ 13 | 96 | ₹ 1,248 |
| Dimmers | Piece | ₹ 300 | - | - |
| MCB | Piece | ₹ 290 | 9.6 | ₹ 2,774 |
| Pipes CPVC | Length | ₹ 405 | 144 | ₹ 58,176 |
| Pipes UPVC | Length | ₹ 310 | 115.2 | ₹ 35,712 |
| Pipes PVC | Length | ₹ 230 | 96 | ₹ 22,176 |
| UPVC | Length | ₹ 650 | - | - |
| Timber | Cubic Foot | ₹ 870 | 24 | ₹ 20,928 |
| Teak Wood | Cubic Foot | ₹ 1900 | - | - |
| Granite | Sq.Ft | ₹ 200 | 144 | ₹ 28,800 |
| Marbles | Sq.Ft | ₹ 385 | - | - |
| Tiles | Sq.Ft | ₹ 65 | 1248 | ₹ 81,120 |
| Paint Per Litre | Litre | ₹ 345 | 172.8 | ₹ 59,962 |
| Per Square Feet | Sq.Ft | ₹ 37 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1850 | - | - |
This cost estimate covers key locations such as Khonsa, Deomali, Kanubari, Borduria, Lazu, Namsang, Soha, Dadam, Tirap, Khela, Kapu, Thinsa, Sinnu, Noknu, Bera, Barap, Laho, Bari-Basip, Natun Balijan, Paniduria.
Construction in Khonsa (Tirap) is shaped by its hilly border location and the humid climate of the Patkai range. For a 960 sqft Residential project reaching ₹1,992,000, the rate of ₹2075 per sqft accounts for the logistical costs of transport and the demand for sturdy residential infrastructure. The Standard material choice focuses on durability and moisture resistance. Interior features include Vitrified Tiles flooring and Basic woodwork. The soil is predominantly rocky and stable, offering good foundation support, but builders must prioritize high-quality external plastering and sloped roofing to handle the seasonal rainfall.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Tiling using Standard is calculated as part of the total ₹1,992,000 budget for Khonsa.
A: Steel prices in Khonsa are factored into the ₹2,075 rate for your 960 sq ft project.
A: Borewell costs in Khonsa are separate from the building construction total of ₹1,992,000.
A: While we provide the ₹1,992,000 cost, we recommend consulting a Khonsa architect for the actual 960 sq ft plan.
A: Using AAC blocks can slightly reduce the civil portion of your ₹1,992,000 budget in Khonsa.
A: Architect fees in Khonsa are usually 2-5% extra and are not included in the core civil cost of ₹1,992,000.
A: In Arunachal Pradesh, particularly in Khonsa, the rate is ₹2,075 per sq ft for 2026.
A: A standard overhead tank is included, but large underground sumps in Khonsa are usually extra.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.