| Area of Construction | 720 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1494000 Rs. |
| Construction Cost in Lacs | ₹ 14.9 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 720 Sq. ft. | 720 Sq. ft. | 720 Sq. ft. |
| Construction Estimate | ₹ 1281600 Rs. | ₹ 1404000 Rs. | ₹ 1620000 Rs. |
| Construction Cost in Lacs | ₹ 12.816 Lacs | ₹ 14.04 Lacs | ₹ 16.2 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 720 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1195200 Rs. |
| Construction Cost in Lacs | ₹ 11.952 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 720 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1152000 Rs. |
| Construction Cost in Lacs | ₹ 11.52 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 720 Square feet of area
*The 720 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 720 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 340 | 303 | ₹ 103,020 |
| River Sand | Unit (100 CFT) | ₹ 7800 | 12.96 | ₹ 101,088 |
| M Sand | Unit (100 CFT) | ₹ 5500 | 12.96 | ₹ 71,280 |
| Clay Bricks | Piece | ₹ 11 | 6840 | ₹ 75,240 |
| Cement Blocks | Piece | ₹ 35 | 864 | ₹ 30,240 |
| AAC Blocks | Cubic Meter | ₹ 44 | 25.2 | ₹ 1,109 |
| Gravel | Cubic Foot | ₹ 42 | 223.2 | ₹ 9,374 |
| TMT Steel | Ton | ₹ 56500 | 2.52 | ₹ 142,380 |
| Conduit Pipes | Rft | ₹ 39 | 1080 | ₹ 42,120 |
| Metal Boxes 6 Switches | Piece | ₹ 72 | 14.4 | ₹ 1,037 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1350 | 10.8 | ₹ 14,580 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5500 | - | - |
| Switches Lower Range | Piece | ₹ 28 | 108 | ₹ 3,024 |
| Switches High Range | Piece | ₹ 175 | - | - |
| Sockets | Piece | ₹ 12 | 72 | ₹ 864 |
| Dimmers | Piece | ₹ 285 | - | - |
| MCB | Piece | ₹ 275 | 7.2 | ₹ 1,980 |
| Pipes CPVC | Length | ₹ 385 | 108 | ₹ 41,580 |
| Pipes UPVC | Length | ₹ 295 | 86.4 | ₹ 25,488 |
| Pipes PVC | Length | ₹ 220 | 72 | ₹ 15,840 |
| UPVC | Length | ₹ 620 | - | - |
| Timber | Cubic Foot | ₹ 830 | 18 | ₹ 14,940 |
| Teak Wood | Cubic Foot | ₹ 1800 | - | - |
| Granite | Sq.Ft | ₹ 190 | 108 | ₹ 20,520 |
| Marbles | Sq.Ft | ₹ 365 | - | - |
| Tiles | Sq.Ft | ₹ 62 | 936 | ₹ 58,032 |
| Paint Per Litre | Litre | ₹ 330 | 129.6 | ₹ 42,768 |
| Per Square Feet | Sq.Ft | ₹ 35 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1750 | - | - |
This cost estimate covers key locations such as Khalilabad, Mehdawal, Dhanghata, Maghar, Ledwa Mahua, Hainsar, Belhar Kala, Semariyawan, Baghauli, Nath Nagar, Pauli, Santha, Bakhira, Dharmshala, Khalilabad Road, Munderwa Road, Ghanghata, Gorakhpur Road, Basti Road, Mehdawal Road.
Construction in Khalilabad (Sant Kabir Nagar) is influenced by its role as a key textile hub and its proximity to Gorakhpur. For a 720 sqft Residential project reaching ₹1,494,000, the rate of ₹2075 per sqft reflects the logistical ease of the NH-28 and the demand for modern residential housing. The Standard material selection focuses on durability and moisture resistance. Interior finishes like Vitrified Tiles flooring and Basic woodwork are standard in the local market. The soil is fertile alluvium, providing a stable foundation base but requiring attention to the water table. Builders in Khalilabad must prioritize high-quality external plastering and robust plinth protection to ensure the building withstands the regional climate and seasonal variations of Purvanchal.
Construction in developing regions presents a unique set of variables, primarily centered around infrastructure development and supply chain reach. While labor is often very cost-effective and readily available, material procurement might require transporting goods from distant city centers, which can slightly increase transportation costs. However, the lower cost of land and fewer administrative hurdles often offset these logistical premiums. These projects often involve working with localized material resources, which requires careful planning to ensure the quality matches modern building standards. This tier represents a highly pragmatic approach, focusing on providing essential, robust infrastructure while maintaining high affordability for the local population.
A: A 1200 sq ft house in Khalilabad would follow the same ₹2,075 per sq ft logic as your 720 sq ft estimate.
A: A standard overhead tank is included, but large underground sumps in Khalilabad are usually extra.
A: In Uttar Pradesh, particularly in Khalilabad, the rate is ₹2,075 per sq ft for 2026.
A: Standard architectural elevation is included in the ₹1,494,000 construction estimate for Khalilabad.
A: It is most accurate for Khalilabad; other parts of Uttar Pradesh may vary slightly from the ₹2,075 rate.
A: You can lower the ₹1,494,000 budget by opting for basic materials or removing the No component.
A: Yes, due to material inflation in Uttar Pradesh, the 2026 rate has reached ₹2,075 per sq ft.
A: Borewell costs in Khalilabad are separate from the building construction total of ₹1,494,000.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.