| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1826000 Rs. |
| Construction Cost in Lacs | ₹ 18.26 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 880 Sq. ft. | 880 Sq. ft. | 880 Sq. ft. |
| Construction Estimate | ₹ 1566400 Rs. | ₹ 1716000 Rs. | ₹ 1980000 Rs. |
| Construction Cost in Lacs | ₹ 15.664 Lacs | ₹ 17.16 Lacs | ₹ 19.8 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1460800 Rs. |
| Construction Cost in Lacs | ₹ 14.608 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1408000 Rs. |
| Construction Cost in Lacs | ₹ 14.08 Lacs |
| Cost / Sq.ft | ₹ 1600 |
| Consideration | Construction Estimate / Cost is calculated based on the 880 Square feet of area , Construction Quality with using flooring and Ply Woodwork is 200 |
|---|
*The 880 sq ft area is for illustration purposes only. You can change based on your requirement.
A: Standard internal wiring is included, but external EB deposit fees in Jalgaon are usually extra.
A: Yes, the ₹1,826,000 total for your 880 sq ft project in Jalgaon includes both material and labor charges.
A: It is most accurate for Jalgaon; other parts of Maharashtra may vary slightly from the ₹2,075 rate.
A: The ₹1,826,000 estimate assumes normal soil; rocky or marshy land in Jalgaon may increase foundation costs.
A: A 880 sq ft build in Jalgaon uses roughly 3-4 tons of steel, which is accounted for in the ₹1,826,000 total.
A: Professional plumbing is part of the ₹1,826,000 budget, averaging a fixed percentage of the ₹2,075 rate.
A: Given the current ₹2,075 rate in Jalgaon, starting in 2026 helps avoid future material price hikes in Maharashtra.
A: The choice depends on your preference, but both are compatible with the ₹1,826,000 budget for Jalgaon.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.