| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1826000 Rs. |
| Construction Cost in Lacs | ₹ 18.3 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 880 Sq. ft. | 880 Sq. ft. | 880 Sq. ft. |
| Construction Estimate | ₹ 1566400 Rs. | ₹ 1716000 Rs. | ₹ 1980000 Rs. |
| Construction Cost in Lacs | ₹ 15.664 Lacs | ₹ 17.16 Lacs | ₹ 19.8 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1460800 Rs. |
| Construction Cost in Lacs | ₹ 14.608 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 880 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1408000 Rs. |
| Construction Cost in Lacs | ₹ 14.08 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 880 Square feet of area
*The 880 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 880 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 320 | 370 | ₹ 118,400 |
| River Sand | Unit (100 CFT) | ₹ 7400 | 15.84 | ₹ 117,216 |
| M Sand | Unit (100 CFT) | ₹ 5200 | 15.84 | ₹ 82,368 |
| Clay Bricks | Piece | ₹ 11 | 8360 | ₹ 87,780 |
| Cement Blocks | Piece | ₹ 33 | 1056 | ₹ 34,848 |
| AAC Blocks | Cubic Meter | ₹ 42 | 30.8 | ₹ 1,294 |
| Gravel | Cubic Foot | ₹ 40 | 272.8 | ₹ 10,912 |
| TMT Steel | Ton | ₹ 53700 | 3.08 | ₹ 165,319 |
| Conduit Pipes | Rft | ₹ 37 | 1320 | ₹ 48,840 |
| Metal Boxes 6 Switches | Piece | ₹ 68 | 17.6 | ₹ 1,197 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 13.2 | ₹ 16,936 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5200 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 132 | ₹ 3,564 |
| Switches High Range | Piece | ₹ 165 | - | - |
| Sockets | Piece | ₹ 11 | 88 | ₹ 968 |
| Dimmers | Piece | ₹ 270 | - | - |
| MCB | Piece | ₹ 260 | 8.8 | ₹ 2,297 |
| Pipes CPVC | Length | ₹ 365 | 132 | ₹ 48,312 |
| Pipes UPVC | Length | ₹ 280 | 105.6 | ₹ 29,568 |
| Pipes PVC | Length | ₹ 210 | 88 | ₹ 18,392 |
| UPVC | Length | ₹ 590 | - | - |
| Timber | Cubic Foot | ₹ 790 | 22 | ₹ 17,358 |
| Teak Wood | Cubic Foot | ₹ 1700 | - | - |
| Granite | Sq.Ft | ₹ 180 | 132 | ₹ 23,892 |
| Marbles | Sq.Ft | ₹ 345 | - | - |
| Tiles | Sq.Ft | ₹ 59 | 1144 | ₹ 67,496 |
| Paint Per Litre | Litre | ₹ 315 | 158.4 | ₹ 49,738 |
| Per Square Feet | Sq.Ft | ₹ 33 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1650 | - | - |
This cost estimate covers key locations such as Dausa Town, Lalsot, Bandikui, Mahwa, Sikrai, Nangal Rajawatan, Ramgarh Pachwara, Paparda, Sainthal, Mandawar, Lawan, Dausa Rural, Agra Road, Jaipur Road, Gupteshwar Road, Somnath Nagar, Mandi Road, Khawa, Bapi, Rahuwas.
In Dausa, construction is influenced by its role as a key transit point near Jaipur and the growing demand for modern housing. For a 880 sqft Residential build reaching ₹1,826,000, the rate of ₹2075 per sqft accounts for the logistical ease of sourcing materials and the use of quality local bricks. The Standard material choice focuses on durability and thermal comfort. Interior aesthetics feature Vitrified Tiles flooring and Basic woodwork. The soil is predominantly alluvium with some sandy patches, requiring standard but robust foundation designs. Builders focus on efficient water storage and high-quality external plastering to handle the seasonal climate.
Construction in developing regions presents a unique set of variables, primarily centered around infrastructure development and supply chain reach. While labor is often very cost-effective and readily available, material procurement might require transporting goods from distant city centers, which can slightly increase transportation costs. However, the lower cost of land and fewer administrative hurdles often offset these logistical premiums. These projects often involve working with localized material resources, which requires careful planning to ensure the quality matches modern building standards. This tier represents a highly pragmatic approach, focusing on providing essential, robust infrastructure while maintaining high affordability for the local population.
A: A 880 sq ft build in Dausa uses roughly 3-4 tons of steel, which is accounted for in the ₹1,826,000 total.
A: While we provide the ₹1,826,000 cost, we recommend consulting a Dausa architect for the actual 880 sq ft plan.
A: The choice depends on your preference, but both are compatible with the ₹1,826,000 budget for Dausa.
A: Yes, the ₹1,826,000 quote includes standard electrical wiring and modular points for a 880 sq ft area.
A: Construction of a 880 sq ft Building property in Dausa typically takes 8-12 months within the ₹1,826,000 budget.
A: The roof slab for 880 sq ft in Dausa is one of the largest expenses within the ₹1,826,000 total.
A: The ₹1,826,000 budget covers basic kitchen civil work; premium modular cabinets are typically additional.
A: Yes, our 2026 estimate of ₹1,826,000 for Dausa assumes the use of high-quality M-Sand.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.