| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1950500 Rs. |
| Construction Cost in Lacs | ₹ 19.5 Lacs |
| Cost / Sq.ft | ₹ 2075 |
| TYPE | Avg. Quality | Good Quality | Best Quality |
|---|---|---|---|
| Area of Construction | 940 Sq. ft. | 940 Sq. ft. | 940 Sq. ft. |
| Construction Estimate | ₹ 1673200 Rs. | ₹ 1833000 Rs. | ₹ 2115000 Rs. |
| Construction Cost in Lacs | ₹ 16.732 Lacs | ₹ 18.33 Lacs | ₹ 21.15 Lacs |
| Cost / Sq.ft | ₹ 1780 | ₹ 1950 | ₹ 2250 |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1560400 Rs. |
| Construction Cost in Lacs | ₹ 15.604 Lacs |
| Cost / Sq.ft | ₹ 1660 (Excluding Labour) |
| Area of Construction | 940 Sq. ft. |
|---|---|
| Construction Estimate | ₹ 1504000 Rs. |
| Construction Cost in Lacs | ₹ 15.04 Lacs |
| Cost / Sq.ft | ₹ 1600 |
Consideration : Construction Estimate / Cost is calculated based on the 940 Square feet of area
*The 940 sq ft area is for illustration purposes only. You can change based on your requirement.
| Item | Unit | Avg. Price | Requirement (for 940 sqft) | Total Material Cost |
|---|---|---|---|---|
| Cement | Bag | ₹ 330 | 395 | ₹ 130,350 |
| River Sand | Unit (100 CFT) | ₹ 7600 | 16.92 | ₹ 128,592 |
| M Sand | Unit (100 CFT) | ₹ 5300 | 16.92 | ₹ 89,676 |
| Clay Bricks | Piece | ₹ 11 | 8930 | ₹ 96,444 |
| Cement Blocks | Piece | ₹ 34 | 1128 | ₹ 38,352 |
| AAC Blocks | Cubic Meter | ₹ 43 | 32.9 | ₹ 1,415 |
| Gravel | Cubic Foot | ₹ 41 | 291.4 | ₹ 11,947 |
| TMT Steel | Ton | ₹ 55350 | 3.29 | ₹ 182,167 |
| Conduit Pipes | Rft | ₹ 38 | 1410 | ₹ 53,580 |
| Metal Boxes 6 Switches | Piece | ₹ 71 | 18.8 | ₹ 1,335 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) FROM | Coil | ₹ 1300 | 14.1 | ₹ 18,654 |
| cables and Wires ( 1 To 6 SQ MM - 90 Meters) HIGH | Coil | ₹ 5350 | - | - |
| Switches Lower Range | Piece | ₹ 27 | 141 | ₹ 3,807 |
| Switches High Range | Piece | ₹ 170 | - | - |
| Sockets | Piece | ₹ 12 | 94 | ₹ 1,128 |
| Dimmers | Piece | ₹ 280 | - | - |
| MCB | Piece | ₹ 270 | 9.4 | ₹ 2,538 |
| Pipes CPVC | Length | ₹ 375 | 141 | ₹ 53,157 |
| Pipes UPVC | Length | ₹ 290 | 112.8 | ₹ 32,599 |
| Pipes PVC | Length | ₹ 215 | 94 | ₹ 20,304 |
| UPVC | Length | ₹ 610 | - | - |
| Timber | Cubic Foot | ₹ 815 | 23.5 | ₹ 19,106 |
| Teak Wood | Cubic Foot | ₹ 1750 | - | - |
| Granite | Sq.Ft | ₹ 185 | 141 | ₹ 26,226 |
| Marbles | Sq.Ft | ₹ 360 | - | - |
| Tiles | Sq.Ft | ₹ 61 | 1222 | ₹ 74,542 |
| Paint Per Litre | Litre | ₹ 325 | 169.2 | ₹ 54,652 |
| Per Square Feet | Sq.Ft | ₹ 34 | - | - |
| Raliling And Grills - Running Feet | Rft | ₹ 1700 | - | - |
This cost estimate covers key locations such as Basar, Tirbin, Dari, Sago, Ego, Gensi, Kangku, Padi, Bam, Dochi, Dilne, Gori, Soi, Nyodu, Riba, Kamduk, Pagi, Paring, Penge, Paring.
Construction in Basar (Lepa Rada) is influenced by its central location and hilly ridge topography. For a 940 sqft Residential project totaling ₹1,950,500, the rate of ₹2075 per sqft reflects the logistical costs of material transport via the Trans-Arunachal Highway and the need for earthquake-resistant designs. The Standard material choice focuses on structural durability and moisture protection. Interior aesthetics feature Vitrified Tiles flooring and customized Basic woodwork. The soil is predominantly stable loamy soil and rock, but builders must prioritize robust drainage and retaining structures to manage the humid regional climate.
Remote and hill areas represent the most challenging construction environments due to unpredictable terrain, weather-dependent access, and logistical complexity. Transporting materials to these locations often involves specialized vehicles, navigating narrow roads, and managing long transit times, which creates substantial logistical overheads. Labor management is also more demanding, as workers may require on-site accommodation, food, and specialized site safety arrangements. Furthermore, construction techniques must often be adapted for specific climate or soil conditions found in hilly regions. The pricing for this tier is purposefully structured to account for these inherent risks, higher maintenance, and the intensive effort required to deliver durable structures in difficult geographical locations.
A: Yes, the ₹1,950,500 total for your 940 sq ft project in Basar includes both material and labor charges.
A: A 1200 sq ft house in Basar would follow the same ₹2,075 per sq ft logic as your 940 sq ft estimate.
A: Yes, due to material inflation in Arunachal Pradesh, the 2026 rate has reached ₹2,075 per sq ft.
A: Given the current ₹2,075 rate in Basar, starting in 2026 helps avoid future material price hikes in Arunachal Pradesh.
A: Architect fees in Basar are usually 2-5% extra and are not included in the core civil cost of ₹1,950,500.
A: Yes, premium emulsion painting is factored into the ₹1,950,500 estimate for your 940 sq ft home.
A: Yes, skilled labor in Basar is required for Standard quality, which is reflected in the ₹2,075 rate.
A: The estimate of ₹1,950,500 is based on current 2026 material rates in Basar and may vary with market shifts.
Find the building Construction Cost for your land based on the State, city and locality. The Construction's material cost is tend to change between area to area, For example construction cost in village is not equal to the construction cost in City. It also varies based on the labour, material availability near by, sand availability and raw materials availability, etc.
The major construction material used in construction of house or building's are Brick & hollow brick, Cement, Steel rod, Jalli , hard stone small, hard stone big, River Sand,
Manufactured Sand, Crushed stone powder, different types of wood, Tiles or granite, House Wiring and Switches, plumbing , water tank fixing , etc. So while starting the
house construction, we must know the price / rates of construction materials regularly.