Borewell Cost in Delhi | Borewell Estimate 2026
Borewell Cost Estimate per Sqft in Delhi
| Water Level | 305 Feet |
| Ideal Borewell depth | 375 Feet |
| Good Borewell depth | 365 Feet |
Delhi Borewell Cost by Size
| 4.5 Inch Dia Drilling Rate | Small Home | ₹ 90 / Feet |
| 6.5 Inch Dia Drilling Rate | Home / Flats / Shops | ₹ 104 / Feet |
| 7.5 Inch Dia Drilling Rate | Commercial / Society | ₹ 161 / Feet |
| 12 Inch Dia Drilling Rate | Agriculture / Industry | ₹ 182 / Feet |
4.5 Inch Dia - Borewell / Drilling Cost
| Total drilling Cost | ₹ 33750 |
| * PVC Pipe Cost | ₹ 15375 |
| Additional Cost for Narrow Space / Equipment | ₹ 3750 |
| Total Bore well Cost / Estimate | ₹ 52875 |
6.5 Inch Dia - Borewell / Drilling Cost
| Total drilling Cost | ₹ 39000 |
| *PVC Pipe Cost | ₹ 20625 |
| Additional Cost for Narrow Space | ₹ 5625 |
| Total Bore well Cost / Estimate | ₹ 65250 |
7.5 Inch Dia - Borewell / Drilling Cost in Delhi
| Total drilling Cost | ₹ 60375 |
| *PVC Pipe Cost | ₹ 24750 |
| Additional Cost for Narrow Space | ₹ 7500 |
| Total Bore well Cost / Estimate | ₹ 92625 |
Delhi 12 Inch Dia - Borewell Cost
| Total drilling Cost | ₹ 68250 |
| *PVC Pipe Cost | ₹ 35625 |
| Additional Cost for Narrow Space | ₹ 9375 |
| Total Bore well Cost / Estimate | ₹ 113250 |
*Above Bore well cost for Ideal Drilling Depth
*For Narrow Space additional equipment required, hence may incur Extra Cost
* PVC Pipe Installation may varry based on the Soil / Rock type. Here we calculated Average !
DJB/CGWA Rules: Prior NOC from Delhi Jal Board is mandatory. Boring is generally banned in 'Over-exploited' districts unless for essential services.
*Regulations updated as per 2026 state-wise groundwater policies. Non-compliance may lead to sealing of the borewell and environmental fines.
Find Borewell Cost in your State and City
Borewell Cost estimate for cities in Delhi
Find the borewell cost for your land based on the state, city, and locality. The cost estimate for a borewell tends to vary from area to area. For example, the borewell cost in a village is not the same as the cost in a city. It also depends on factors such as the accessibility of the borewell point, the type of soil (rock or loose soil), labor rates in the locality, PVC pipe and lid prices, and the availability of borewell equipment nearby.